Turnkey Modular Steel Bridge Solutions for Projects by JSSJ
Emergency Rescue Bridge Solutions
Frequent flash floods threaten Chishi River and Beikeng Reservoir. Aging bridges are easily damaged, cutting off local traffic and delaying emergency rescue. The prefabricated Bailey steel bridge can be erected rapidly, adapting to harsh flood conditions, restoring river-crossing access and improving regional flood prevention and traffic safety.
The Yellow River’s strong scouring endangers aging bridges in Lanzhou during flood seasons. The prefabricated steel bridge features stable structure and strong anti-scouring performance, providing reliable emergency passage and improving urban traffic safety in flood periods.
Affected by strong sea winds and tides, Macau faces growing cross-sea traffic pressure. The new sea-crossing steel bridge features corrosion resistance and large traffic capacity. It optimizes regional transportation connection, eases commuting pressure and upgrades coastal infrastructure.
Afghanistan features rugged mountains, fast-flowing rivers and frequent seasonal floods, damaging traditional bridges and blocking traffic. Prefabricated steel bridges are quick to erect, durable and load-bearing, adapting to harsh plateau terrain. They restore river crossings rapidly, supporting livelihoods and regional connectivity.
China Railway Major Bridge Engineering Bureau carried out the construction of main tower foundations and pier caps. Jiangsu Sujian Road & Bridge supplied temporary steel structures including marine trestles, steel cofferdam supports, Bailey frame platforms and river-crossing bridges, with full design, fabrication and erection services.
This steel bridge is 750 meters long and 8 meters wide, using an assembled structure of SJ- 321 steel bailey beams with a designed load capacity of 100 tons. It was a rare deep-water steel trestle project constructed under extreme working conditions with water depth over 40 meters and an exposed, inclined rock riverbed in China at that time.
Jiangsu Sujian Road & Bridge has established strategic cooperation with the Department of Works and Highways (DW&H) of Papua New Guinea, deeply participating in key national projects such as Highlands Highway upgrading, new river-crossing bridges and existing bridge rehabilitation.
Jiangsu Sujian Road & Bridge Machinery has specialized in prefabricated steel bridges for over a decade. Our products have been deployed on numerous major projects at home and abroad, including the Jakarta-Bandung High-Speed Railway, Guangdong-Hong Kong-Macao Bridge and Wuhan Shuangliu Yangtze River Bridge.
The urban pedestrian temporary steel bridge is a mature and practical temporary traffic renovation solution independently supplied and technically supported by JSSJ widely applied in urban road upgrading, municipal construction and traffic diversion scenarios.
Based in Jiangsu, serving the world. The company upholds the philosophy of "Quality First, Technology Pioneering" and the mission of "Building Brands with Quality, Promoting Development with Brands".